New Progress Has Been Made in Multiple Projects in The Boiler And Refueling Station Fields.

Jul 06, 2026

Leave a message

New progress has been made in multiple projects in the boiler and refueling station fields.

 

In terms of boilers, several large-capacity clean coal power projects have reached key milestones. A high-parameter unit operating at over 600°C has completed the manufacturing of core components, laying the foundation for subsequent installation. Additionally, multiple cogeneration projects have successfully ignited their boilers on the first attempt and moved into the equipment commissioning phase. Meanwhile, the energy-saving renovation of industrial boilers continues to accelerate, with many regions initiating coal-fired boiler replacement or ultra-low emission renovation projects.

In terms of bunkering stations, the first inland river LNG bunkering facility has been put into operation, and a LNG offshore bunkering station in a certain port area has officially commenced operations, with a designed annual throughput capacity of nearly 20,000 tons, filling the gap in clean fuel supply for regional water transportation. Meanwhile, the bonded LNG ship-to-ship bunkering business has exceeded 140 operations, with the total bunkering volume continuing to climb. In the field of land transportation, a comprehensive energy supply station integrating refueling, gas filling, and hydrogen refueling has been put into trial operation; multiple hydrogen production and refueling integrated station projects have been registered, with daily hydrogen refueling capacities ranging from hundreds of kilograms to several tons.

 

Overall, the boiler industry is steadily advancing towards high efficiency and cleanliness, while refueling stations are accelerating their transformation into multi-energy integrated service stations.

Send Inquiry